Refereed Journal Papers
Hamilton A.; Wang H.; Tanyer A. M.; Arayici Y.; Zhang, X. and Song, Y. (2005) “Urban Information Model for City Planning”, Electronic Journal of Information Technology in Construction [online], November, Vol. 10, Special Issue From 3D to nD Modelling, pp.55-67. Available at: <URL: http://www.itcon.org/2005/6>.
Tanyer, A. M.; Aouad, G. (2005) “Moving Beyond the Fourth Dimension with an IFC Based Single Project Database”, Automation in Construction, 14(1), pp. 15-32.
Sarshar, M.; Tanyer, A. M.; Aouad, G.; Underwood, J. (2002) “ A Vision for Construction IT 2005–2010: Two Case Studies”, Engineering, Construction and Architectural Management, 9(2), pp. 152-160.
Refereed Conference Papers
Tanyer, A. M. (2006) “Using CAD Standards in Construction Project Life Cycle: Three Success Stories from the United Kingdom”, International Conference On Construction Information Technology (INCITE / ITCSED 2006): IT Solutions for the Design & Management of Infrastructure Construction Projects, Edited by: Kumar, B.; Swarup, P. 15-17 November, New Delhi, India, v.2, pp.287-297.
Tanyer, A. M.; Tah, J. H. M.; Aouad, G. (2005) “An Integrated Database to Support Collaborative Urban Planning: The N-Dimensional Modelling Approach”, ASCE Conference on Computing in Civil Engineering, 12-15 July, Cancun, Mexico.
Tanyer, A. M.; Tah, J. H. M.; Aouad, G. (2005) “Towards n-Dimensional Modelling in Urban Planning”, Innovation in Architecture, Engineering & Construction (AEC), Edited by: Sarıyıldız, S,; Tunçer, B., 15-17 June, Rotterdam, pp.503-512.
Tanyer, A. M.; Tah, J. H. M.; Aouad, G. (2005) “Exploring Crime in the ND Modelling Environment: Crime Mapping And CPTED Approaches”, Second International Salford Centre for Research and Innovation (SCRI) Research Symposium, Edited by: Aouad, G.; Kagioglou, M.; Amaratunga, D.; Ruddock, L.; Sexton, M., 12 - 13 April, Salford, UK, pp. 68-76.
Tanyer, A. M. (2004) “ Çok Boyutlu Kent Planlaması İçin Bir Veritabanı”, Yap ı ve Kentte Bilişim’04 - Kent’te-Dönüşüm: E-Belediyecilik, E-Mühendislik ve E-Kentlilik 3. Ulusal Kongresi, 02-03 Aralık, Ankara , Turkey .
Tanyer, A. M.; Aouad, G. (2004) “An Exploration of Implementation Barriers in Computer Integrated Construction”, First International Salford Centre for Research and Innovation (SCRI) Research Symposium, Edited by: Aouad, G.; Amaratunga, D.; Kagioglou, M.; Ruddock, L.; Sexton, M., 30-31 March, Salford, pp.257-268.
Tanyer, A. M. (2004) “Developing Evaluation Criteria for Computer Integrated Construction: A Usability Analysis with End Users”, International Conference On Construction Information Technology (INCITE 2004): World IT for Design & Construction, Edited by: Brandon, P.; Li, H.; Shen Q., 18-21 February, Langkawi, Malaysia, pp.389-396.
Tanyer, A. M.; Sarshar, M. (2003) “A 4 Dimensional Planning Tool: Validating Research with Industry Practices”, Third International Postgraduate Research Conference in the Built and Human Environment, Edited by: Aouad, G. & Ruddock, L., 3-4 April, Lisbon, pp.807-814.
Tanyer, A. M. (2003) “Improving Decision-Making in Project Management through the Use of Predictive 4D CAD”, CIB Student Chapters International Symposium Innovation in Construction and Real Estate, Edited by: Leung, B.; Kong, S.; Chan, A., 26-27 September, Hong Kong, pp.121-129.
Tanyer, A. M.; Sarshar, M. (2002) “An Evaluation of Computer Integrated Construction: The Implementation Stage”, Second International Postgraduate Research Conference in the Built and Human Environment, Edited by: Sun, M.; Aouad, G.; Green, K.; Ormerod, M.; Ruddock, L.; Alexander, K., 11-12 April, Salford, pp.352-361.
Sarshar, M.; Tanyer, A. M. (2002) “A Vision for Construction IT 2005-2010: Barriers and Priorities for Implementation”, Third International Conference Decision-making in Urban and Civil Engineering, Edited by: Khosrowshahi, F., 6-8 November, London.
Tanyer, A. M. (2002) “Simulation of Construction Activities Using a Shared Database”, Third International Conference Decision-making in Urban and Civil Engineering, Edited by: Khosrowshahi, F., 6-8 November, London.
Tanyer, A. M.; Sarshar, M. (2001) “The Utility and Application of Visioning in Developing Corporate IT Strategy”, First International Postgraduate Research Conference in the Built and Human Environment, Edited by: Sun, M.; Aouad, G.; Ormerod, M.; Ruddock, L., 15-16 March, Salford, pp.672-683.
Other Publications
Tanyer, A. M. (2004) Implementation Barriers of Computer Integrated Construction: A Usability Perspective, Ph.D. Thesis, University of Salford.
Tanyer, A. M. (2004) “System Development Life Cycle”, A Course Book for the MSc in IT Management in Construction. University of Salford.
Tanyer, A. M. & Underwood, J. (2004) “How to Develop Your IT Infrastructure”, Construct IT Center of Excellence, University of Salford.
Tanyer, A. M. (2003) “Object Technology Case Study: DIVERCITY”, Chapter for the Object Technology Course Book - MSc in IT Management in Construction. Edited by: Sarshar, M., University of Salford.
Tanyer, A. M. (2003) “Industry Foundation Classes”, Chapter for the Object Technology Coursebook - MSc in IT Management in Construction. Edited by: Sarshar, M., University of Salford.
Tanyer, A. M. & Underwood, J. (2003) “How to Develop Your CAD Standards”, Construct IT Center of Excellence, University of Salford.
Tanyer, A. M. (2003) “How to Align IT Strategy to the Industry Vision”, Construct IT Center of Excellence, University of Salford.
Tanyer, A. M. (1998) Principles of Purchasing: A Guide for Contractors. M.Sc. Thesis, Middle East Technical University.
Presentations
Tanyer, A. M. (2003) “Monitoring Processes and Costs in an IFC Environment”, International Alliance for Interoperability (IAI) UK Chapter Meeting, Salford, 27 June 2003