WORK EXPERIENCE

ENGINEERING EXPERIENCE

Middle East Technical University, North Cyprus.                               September  2006 - present       

Teaches water related civil engineering courses such as

o        Engineering Hydrology,

o        Hydromechanics,

o        Water Resources Engineering,

o        Sustainable Water Resources,

o        Statistical Techniques in Hydrology

o        Surveying

 

KGS Group, Winnipeg, Manitoba, Canada.                                                June  2005 – July 2006       

Worked as a specialized water resources engineer on the variety of water resources and municipal infrastructure projects across Canada and US such as

o        Dam Break Analysis,

o        Hydraulic-Hydrologic Design and Analysis,

o        Reservoir Simulation Analysis,

o        Numerical / Physical Modeling,

o        Stochastic Modeling,

o        Storm Water Management,

o        River System Analysis,

o        Flood and Drought Frequency Analysis;

o        Channel / Reservoir Routing.

 

Manitoba Hydro, Winnipeg, Manitoba, Canada.                                                            2001 - 2002       

Completed and submitted a project entitled “Frequency Analysis of Energy Drought” to the Resource Planning and Market Analysis Department of Manitoba Hydro. This project has been conducted in-house at Manitoba Hydro. During this project:

o        Analyzed streamflow data of Nelson and Churchill River Basins,

o        Developed and calibrated spatial scale stochastic model for Manitoba Hydro’s system,

o        Generated synthetic streamflow data using multivariate stochastic models,

o        Developed physical reservoir regulation models for the Lake Winnipeg and Southern Indian Lake outflows,

o        Developed the drought simulation model for the system, and

o        Analyzed the return period of Manitoba Hydro’s critical drought.

 

Emek Construction Co. Ltd, North Cyprus                                                                   1992 – 1995

o        Supervised the construction of a sewer system , an Olympic swimming pool, several buildings, and roads,

o        Designed the residential, industrial, and commercial building structures,

o        Controlled the engineering projects that are constructed by contractors,

o        Developed and scheduled construction activities,

o        Worked in the cost estimates team,

o        Conducted research to determine unit prices of each activities and materials,

o        Performed survey of the construction land using surveying methods, and

o        Organized the delivery of materials and equipments needed for the construction.

__________________________________________________________________________________

 

RESEARCH EXPERIENCE 

University of Manitoba, Canada                                                                                   2000 - 2005

Analyzed data, model and parameter uncertainties associated with stochastic models in the probability of the Churchill-Nelson River Basin streamflow drought. The project is funded by Manitoba Hydro and Natural Sciences and Engineering Research Council, Canada. During this research:

o        Analyzed the Churchill-Nelson River Basin streamflow data statistically,

o        Identified the uncertainties associated with stochastic models, parameters, and data in the assessment of hydro-power system drought probability,

o        Developed Markov-Switching model-based stochastic modeling framework,

o        Incorporated identified uncertainties into stochastic models using Bayesian Markov Chain Monte Carlo (MCMC) methods, and

o        Compared the developed Markov-Switching model with traditional stochastic streamflow models in hydrology, using several drought statistics.

 

Eastern Mediterranean University, North Cyprus                                                       1995 - 2000

Analyzed meteorological drought of North Cyprus using Palmer Drought Severity Index (PDSI). During this research:

o        Filled-in missing meteorological monthly data,

o        Programmed the physical hydrologic water balance model of PDSI,

o        Simulated PDSI values from observed precipitation and temperature data, and

o        Compared the PDSI values with other drought indices.

__________________________________________________________________________________

 

TEACHING EXPERIENCE

University of Manitoba, Canada                                                                                   2000 - 2005

Worked as a teaching assistant for Fluid Mechanics, Hydraulics, Engineering Hydrology, and Civil Engineering Systems courses.

o        Tutored the students in the classroom and privately,

o        Held office hours for students’ questions,

o        Prepared the tutorial and assignment problems,

o        Conducted laboratory tests with group of students, and

o        Marked lab reports and assignments.

o        Substituted for professor on various occasions and teaching.

 

Eastern Mediterranean University, North Cyprus                                                                   1995 - 2000

Worked as a teaching assistant for Engineering Hydrology, Water Resources Engineering, Fluid Mechanics, Open Channel and Hydraulics courses.

o        Prepared the tutorial and assignment problems, and lab demonstrations,

o        Tutored the students in the classroom and in the office,

o        Held office hours for students questions,

o        Supervised undergraduate students during course registrations periods,

o        Marked assignments and lab reports, and

o        Substituted for professor on various occasions and teaching.

__________________________________________________________________________________