ENGINEERING EXPERIENCE

ENGINEERING EXPERIENCE

KGS Group, Winnipeg, Manitoba, Canada.                                                June  2005 – July 2006       

Worked as a specialized water resources engineer on the variety of water resources and municipal infrastructure projects across Canada and US such as

o        Dam Break Analysis,

o        Hydraulic-Hydrologic Design and Analysis,

o        Reservoir Simulation Analysis,

o        Numerical / Physical Modeling,

o        Stochastic Modeling,

o        Storm Water Management,

o        River System Analysis,

o        Flood and Drought Frequency Analysis;

o        Channel / Reservoir Routing.

 

Manitoba Hydro, Winnipeg, Manitoba, Canada.                                                            2001 - 2002       

Completed and submitted a project entitled “Frequency Analysis of Energy Drought” to the Resource Planning and Market Analysis Department of Manitoba Hydro. This project has been conducted in-house at Manitoba Hydro. During this project:

o        Analyzed streamflow data of Nelson and Churchill River Basins,

o        Developed and calibrated spatial scale stochastic model for Manitoba Hydro’s system,

o        Generated synthetic streamflow data using multivariate stochastic models,

o        Developed physical reservoir regulation models for the Lake Winnipeg and Southern Indian Lake outflows,

o        Developed the drought simulation model for the system, and

o        Analyzed the return period of Manitoba Hydro’s critical drought.

 

Emek Construction Co. Ltd, North Cyprus                                                                   1992 – 1995

o        Supervised the construction of a sewer system , an Olympic swimming pool, several buildings, and roads,

o        Designed the residential, industrial, and commercial building structures,

o        Controlled the engineering projects that are constructed by contractors,

o        Developed and scheduled construction activities,

o        Worked in the cost estimates team,

o        Conducted research to determine unit prices of each activities and materials,

o        Performed survey of the construction land using surveying methods, and

o        Organized the delivery of materials and equipments needed for the construction.

__________________________________________________________________________________